Nenad didn't quite get all the lighting fitted off yesterday, so we'll get that finished next week and make a start on the solar panel frames. He's expecting three days of work to get to the point where we can commission the garage. Can't wait...!

In the meantime, today I got busy with the battery box.







I had hoped to get the cells wired together as well, but I've got other more pressing priorities - I need to get the pump room door fitted so I can finally lock the building up tight, and I also need to trench around the garage for stormwater piping and for the pipe to link the two water tanks together. Since we'll be using a fire pump to push water up the hill to the header tank, I need the two tanks linked so that we draw from each as we pump.