All set. All the bar chairs are in place, all the steel is wired up.



I’ve pinned the mesh to the edge timbers at the right height so they won’t sag under the weight of the concrete, and the plumbing penetrations have been cut, pipes installed and lagged.



The concrete is confirmed, the concreters too, I have the vibrator and helicopter troweller, so if there’s anything I’ve missed I don’t know what it is.



The first concrete truck is due to arrive at 0730 tomorrow, so it’ll be an early night for an early start :)